The Philippines National Irrigation Administration Region XI lists several awards dated August 5, 2026 for solar-powered pump and irrigation facilities. The entries cover one- and two-unit packages at Cabidianan, Upper Saosao, New Panay, Matiao and Lower Saosao, with award values and contractor details.
An award is a stronger delivery signal than an invitation, but it does not define the final hydraulic duty or equipment split. Pump head, flow, water source, PV array, controller, storage, civil works and acceptance tests still need to match each site.
What buyers should verify
- Confirm the signed scope and notice to proceed.
- Verify total dynamic head, seasonal flow and water quality.
- Separate pump, PV, controller, pipeline and civil warranties.
- Require factory and site acceptance records.




